|
COIL TYPE
The perfect solution for steam generation the present scenario of power
shortage. The non-ibr boiler is totally protected with rested fittings
and tested safety devices. The entire assembly is mounted on a single
base plate compactness, portability and aesthetic appearance. The steam
production is automatic.
|
Technical Details
|
|
|
|
|
|
|
Capacity (kg)
|
100
|
200
|
400
|
600
|
800
|
|
Steam out put (kg/hr)
|
100
|
200
|
400
|
600
|
800
|
|
Working Pressure (kg/cm2
)
|
10.54
|
10.54
|
10.54
|
10.54
|
10.54
|
|
Design Pressure (kg/cm2
)
|
17.5
|
17.5
|
17.5
|
17.5
|
17.5
|
|
Hyd .Test pressure (kg/cm2
)
|
26.25
|
26.25
|
26.25
|
26.25
|
26.25
|
|
Efficiency %
|
90+
2
|
90+
2
|
90+
2
|
90+
2
|
90+
2
|
|
Electric load
|
|
|
|
|
|
|
Blower motor (hp/kw)
|
0.25/0.187
|
0.5/0.37
|
1.0/0.75
|
2.0/1.5
|
.03/2.2
|
|
Water pump motor (hp/kw)
|
0.5/0.37
|
0.5/0.37
|
0.5/0.37
|
1.0/0.75
|
1.0/0.75
|
|
Fuel pump motor (hp/kw)
|
-
|
-
|
0.5/0.37
|
0.5/0.37
|
0.5/0.37
|
|
Fuel pre heater (kw)
|
-
|
-
|
2.0
|
3.0
|
4.5
|
|
Fuel consumption
|
|
|
|
|
|
|
Ldo (kg/hr)
|
6
|
12
|
24
|
36
|
47
|
|
Fo (kg/hr)
|
-
|
-
|
25
|
37
|
50
|
|
Burner control
|
On/off
|
On/off
|
On/off
|
On/off
|
On/off
|
|
Electric supply
|
Ac 3 phase 415v+6%
50hz+ 3%;4
wire
|
Ac 3 phase 415v+6%
50hz+ 3%;4
wire
|
Ac 3 phase 415v+6%
50hz+ 3%;4
wire
|
Ac 3 phase 415v+6%
50hz+ 3%;4
wire
|
Ac 3 phase 415v+6%
50hz+ 3%;4
wire
|
|
Total Connected
load
|
|
|
|
|
|
|
Ldo unit (kw)
|
0.56
|
0.75
|
1.5
|
2.7
|
3.5
|
|
Fo unit (kw)
|
-
|
-
|
3.5
|
5.7
|
8.0
|
|
Over all length (m)
|
1.3
|
1.4
|
1.5
|
1.6
|
2.0
|
|
Over all width (m)
|
1.0
|
1.2
|
1.5
|
1.7
|
1.9
|
|
Over all height (m)
|
1.2
|
1.5
|
1.8
|
2.2
|
2.6
|
|
Dry weight (kg)
|
700
|
900
|
1200
|
1600
|
2000
|
|